NR RT/D/P/022 ISSUE 7 PDF

NR RT/D/P/022 ISSUE 7 PDF

Name:
NR RT/D/P/022 ISSUE 7 PDF

Published Date:
04/01/2000

Status:
[ Withdrawn ]

Description:

MANAGEMENT OF THE MONITORING OF CONTRACTS AND CORRECTIVE ACTIONS

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

This Procedure covers the checking of all activities carried out by the RT1A , IMC2 and IMC2000 Contractor under the Infrastructure Maintenance Contract plus recording and follow up of corrective actions.

The scope of this Procedure includes checks on Contractor's management systems (which must include how his sub-contractors are controlled), activities and end products.

Purpose

The purpose of this Procedure is to establish a system for the Management of Monitoring of Contracts and corrective actions follow up which will ensure that the RT/1A /IMC2/IMC2000 Contractor is satisfactorily maintaining Railtrack's Infrastructure. This Procedure outlines the roles and responsibilities of those parties involved in the management of the monitoring system and corrective actions.

Monitoring shall be performed on the basis of a statistically determined regime prioritised by the assessment of risk. The monitoring system shall check, as a minimum:

• Railtrack s Infrastructure assets are fit for purpose

• that Contractual and Technical compliance is being achieved

• the Contractor's adherence to responsibilities set out in their Safety Case

• that Railtrack Plc's commercial interests are being safe-guarded

The minimum requirements to provide confidence to Railtrack that the Contractors Management Systems are effective and their End Products are acceptable are detailed in Procedure RT/D/P/015 Generation of RT1A, IMC2 and IMC2000 Contract Check Plans.

In IMC2 & IMC2000 (only) it is a contractual requirement that the Contractor implements a check and audit regime to a standard equal to, or better than, that required by Line Procedure RT/D/P/015 and this Procedure.

This Procedure amplifies the requirements as shown in the IDEF Element Process Map Box 5.2.2 Measure Contractors Compliance and Box No. 5.2.3 Review Contractors Compliance.

 

 


Edition : 7
File Size : 1 file , 170 KB
Number of Pages : 21
Published : 04/01/2000

History


Related products

NR BRS-SM 52564
Published Date: 01/30/1995
Parts Schedule for Mechanical Backdrive Mounted in 4' on L.H.S in third rail areas full Depth SGV Layout Point Machine Mounted on R.H.S.
$5.7
NR NR/CIV/SD/2166-2 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 9.4m External Unit Right Skew 30º
$5.7
NR BRS-SM 863/1 ISSUE A
Published Date: 01/27/1987
Apparatus Case Small Door for Yale Lock for Door Assembly with Yale Lock
$5.7
NR X08900 ISSUE 1
Published Date: 02/06/1999
AHBC Typical Circuits Absent Controls
$5.7

Best-Selling Products

CTI 105-ATC (00)
Published Date: 02/01/2000
CTI Code Tower Standard Specifications for Acceptance Test Code for Water Cooling Towers
$31.2
CTI 105 S (11)
Published Date: 07/01/2011
Supplement to CTI Code Tower Standard Specifications for Acceptance Test Code for Closed Circuit Cooling Towers
$10.5
CTI 105 S (96)
Published Date: 07/01/1996
CTI Code Tower Standard Specifications for Acceptance Test Code for Closed Circuit Cooling Towers
$10.5
CTI 106-ATC (04)
Published Date: 07/01/2004
Acceptance Test Code for Mechanical Draft Evaporative Vapor Condensers
$10.5
CTI ATC-105 (19)
Published Date: 02/01/2019
Acceptance Test Code For Cooling Towers
$37.5
CTI ATC-106 (11)
Published Date: 07/01/2011
Acceptance Test Code for Mechanical Draft Evaporative Vapor Condensers
$7.5