NR RT/D/P/062 ISSUE 1 PDF

NR RT/D/P/062 ISSUE 1 PDF

Name:
NR RT/D/P/062 ISSUE 1 PDF

Published Date:
11/01/1996

Status:
[ Inactive ]

Description:

MAINTENANCE EFFECTS OF RAILTRACK INVESTMENT

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
INACTIVE S/S BY NR RT/D/P/020 WN * PDF ONLY

SCOPE AND APPLICATION

This Procedure applies to RT1A contracts on all Railtrack Zones.

PURPOSE

This Procedure defines the system to be adopted in Zonal Contract Management to ensure that Railtrack properly identifies and secures the benefits of its investment in Asset Renewal.

 


Edition : 1
File Size : 1 file , 120 KB
Number of Pages : 8
Published : 11/01/1996

History


Related products

NR NR/L3/ELP/27240/NR/DIST C24A ISSUE 2
Published Date: 03/01/2017
Traction Power Supply Silicon Rectifiers
$5.7
NR NR/CIV/SD/621 ISSUE E
Published Date: 06/01/2019
Relocatable Equipment Buildings & Trackside Equipment Housings: Typical TEH Foundation
$5.7
NR BRS-SM 52567
Published Date: 01/30/1995
Parts Schedule for Mechanical Backdrive Mounted in 4' on R.H.S in third Rail areas Full Depth GV Layout Point Machine Mounted on L.H.S
$5.7
NR X01400 ISSUE 2
Published Date: 02/06/1999
AHBC Typical Circuits Layout Double Line Bi-Directional with Separate ATC Strike-In
$5.7

Best-Selling Products

Design for Earthquakes
Published Date: 01/01/1997
I C B O 9033C92
Published Date: 01/01/1992
CABO/ANSI A117.1 Commentary
ICBO 108H01
Published Date:
Principles of Fire Behavior
ICBO 108H02
Published Date:
Design of Water-Based Fire Protection Systems
ICBO 108H03
Published Date:
Hazardous Materials