NR RT/D/P/062 ISSUE 1 PDF

NR RT/D/P/062 ISSUE 1 PDF

Name:
NR RT/D/P/062 ISSUE 1 PDF

Published Date:
11/01/1996

Status:
[ Inactive ]

Description:

MAINTENANCE EFFECTS OF RAILTRACK INVESTMENT

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
INACTIVE S/S BY NR RT/D/P/020 WN * PDF ONLY

SCOPE AND APPLICATION

This Procedure applies to RT1A contracts on all Railtrack Zones.

PURPOSE

This Procedure defines the system to be adopted in Zonal Contract Management to ensure that Railtrack properly identifies and secures the benefits of its investment in Asset Renewal.

 


Edition : 1
File Size : 1 file , 120 KB
Number of Pages : 8
Published : 11/01/1996

History


Related products

NR NR/L3/ELP/27240/NR/DIST C24A ISSUE 2
Published Date: 03/01/2017
Traction Power Supply Silicon Rectifiers
$5.7
NR NR/CIV/SD/621 ISSUE E
Published Date: 06/01/2019
Relocatable Equipment Buildings & Trackside Equipment Housings: Typical TEH Foundation
$5.7
NR BRS-SM 52567
Published Date: 01/30/1995
Parts Schedule for Mechanical Backdrive Mounted in 4' on R.H.S in third Rail areas Full Depth GV Layout Point Machine Mounted on L.H.S
$5.7
NR X01400 ISSUE 2
Published Date: 02/06/1999
AHBC Typical Circuits Layout Double Line Bi-Directional with Separate ATC Strike-In
$5.7

Best-Selling Products

AFS 3D PPSCP
Published Date:
The 3D Printed Precision Sand Casting Process
$22.5
AFS 3DSPB
Published Date:
3D Sand Printing Benefits
$54.6
AFS 3DSPCD
Published Date:
3D Sand Printing Casting Design
$54.6
AFS 3DSPMD
Published Date:
3D Sand Printing Mold Quality
$54.6
AFS 3DSPPT
Published Date:
3D Sand Printing Process and Terminology
$54.6
AFS ACA
Published Date:
Aluminum Casting Alloys
$54.6