NR RT/D/P/090 ISSUE 1 PDF

NR RT/D/P/090 ISSUE 1 PDF

Name:
NR RT/D/P/090 ISSUE 1 PDF

Published Date:
12/01/2002

Status:
[ Withdrawn ]

Description:

Checking IMC2000 Periodic Accounts

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

Periodic accounts must be checked and proved at two levels by Reviewers:

• by the Commercial Representative of the Zone or Contract Area as part of the regular assessment and approval of all Contractor's periodic accounts.

• by a resource secured by Railtrack Headquarters (HQ Team) specifically for the function. The purpose of the HQ Team review is to assist the Zone's checking process, to undertake random independent reviews, to share information on typical problems by circulation of reports, and to promote best practice. These reviews will be undertaken at arbitrary intervals, but will include at least one detailed visit to each Contract Area per annum.

The detailed methods to be used by Reviewers for checking periodic accounts are described in Section 4 below.

A separate Railtrack Procedure will provide guidance on the overall management and reporting of costs. (n.b. This Procedure is currently being drafted.)

Purpose

This Procedure sets out the the process to be used by Railtrack representatives (the Reviewers) when checking periodic accounts submitted by Contractors in accordance with condition 35 of the IMC 2000 Conditions of Contract (CoC).

This process does not relieve the Contractor of his obligation to "certify that each periodic account accurately reflects the resources engaged in the Works" in accordance with condition 35.5 of the CoC.

Where there is a discrepancy between this Procedure and the Contract provisions, the CoC shall take precedence.


Edition : 1
File Size : 1 file , 220 KB
Number of Pages : 20
Published : 12/01/2002

History


Related products

NR NR/L3/ELP/27240/NR/DIST PERIODICITY ISSUE 7
Published Date: 06/03/2023
Distribution Equipment Maintenance Periodicity Matrix
$7.5
NR NR/CIV/SD/710 ISSUE G
Published Date: 06/01/2019
Non-Canopy Station Footbridges: Surface Drainage - CHS Support - Overview
$5.7
NR BRS-SM 52505
Published Date: 02/13/1995
Parts Schedule for Supplementary Detection Right Hand Assembly for 113A Switches Switch Movement 50-80
$5.7
NR NR/L2/SIG/11201/MOD B3 ISSUE 10
Published Date: 06/01/2024
Signalling Design Handbook: Circuits - General
$18.6

Best-Selling Products

Clark on Surveying & Boundaries
Published Date: 01/01/1997
$28.5