Name:
NR RT/D/S/012 ISSUE 5 PDF
Published Date:
04/01/2000
Status:
[ Withdrawn ]
Publisher:
Network Rail
The Specification details the minimum information which Railtrack requires the Contractor to provide for his activities under the Infrastructure Maintenance Contract for each three-month period under the following Contract clauses:-
• RT1A General Specification C1 21.4
• IMC2 Management Procedures C1 20 (which calls for compliance with this Specification)
• IMC2000 Management Procedures Cl 20 (which calls for compliance with this Specification)
Purpose
To provide Railtrack with an overview of safety and of the asset performance of the infrastructure being maintained under Infrastructure Maintenance Contracts.
| Edition : | 5 |
| File Size : | 1 file , 180 KB |
| Number of Pages : | 13 |
| Published : | 04/01/2000 |