NR RT/D/S/012 ISSUE 5 PDF

NR RT/D/S/012 ISSUE 5 PDF

Name:
NR RT/D/S/012 ISSUE 5 PDF

Published Date:
04/01/2000

Status:
[ Withdrawn ]

Description:

Content of Railtracks Infrastructure Maintenance Contractor's Stewardship Report

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

The Specification details the minimum information which Railtrack requires the Contractor to provide for his activities under the Infrastructure Maintenance Contract for each three-month period under the following Contract clauses:-

• RT1A General Specification C1 21.4

• IMC2 Management Procedures C1 20 (which calls for compliance with this Specification)

• IMC2000 Management Procedures Cl 20 (which calls for compliance with this Specification)

Purpose

To provide Railtrack with an overview of safety and of the asset performance of the infrastructure being maintained under Infrastructure Maintenance Contracts.


Edition : 5
File Size : 1 file , 180 KB
Number of Pages : 13
Published : 04/01/2000

History


Related products

NR NR/L3/OCS/044/FS-14J ISSUE 1
Published Date: 06/04/2011
Managed Stations Manual: Environmental Management – Network Rail Managed Stations Pigeon Control Inspection
$5.7
NR NR/GN/CIV/025 ISSUE 3
Published Date: 06/01/2006
The Structural Assessment of Underbridges
$74.4
NR TWI 3G131 ISSUE 1
Published Date: 12/01/2016
How to Manage Residual Risk when Specifying Work to the Asset
$7.5
NR BR 1913
Published Date:
Modular Power Supplies
$5.7

Best-Selling Products