NR RT/E/C/11191 ISSUE 1 PDF

NR RT/E/C/11191 ISSUE 1 PDF

Name:
NR RT/E/C/11191 ISSUE 1 PDF

Published Date:
08/01/2000

Status:
[ Withdrawn ]

Description:

Signal and Telecomms Cable Laying from Rail Wagons or by Mole Plough (aka NR/GN/SIG/11191)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

The provisions of this Code of Practice apply to the planning and installation of Signalling and Telecommunications (S&T) cables and/or ducts by laying from rail wagons. This includes drum handling and direct burial by mole plough.

PURPOSE

To define a policy when laying cables and ducts from rail wagons or by mole plough which ensures that safe working practices are observed.


Edition : 1
File Size : 1 file , 140 KB
Number of Pages : 14
Published : 08/01/2000

History


Related products

NR NR/SMS/PART/A ISSUE 16
Published Date: 03/04/2023
Signal Maintenance Specifications (SMS): PART A
$24.3
NR T60079 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits Indicators - Junction Indicator (2 Positions) Acc: Electronic Interface (Pot/ Clam) Peripheral Loc. - Loc. Case Circuit
$5.7
NR RT/ETE/5/1/5
Published Date: 03/17/1998
Relationship of Conductor Rail to Standard Load Gauge and D.C. Electric Rolling Stock Clearance
$5.7
NR NR/L2/SIG/11201/MOD A4-2 ISSUE 1
Published Date: 06/02/2018
Signalling Design Handbook: Signalling Plan & Signal Box Notes (Including GFs and Level Crossings)
$13.2

Best-Selling Products