NR RT/E/C/50015 ISSUE 1 PDF

NR RT/E/C/50015 ISSUE 1 PDF

Name:
NR RT/E/C/50015 ISSUE 1 PDF

Published Date:
02/01/2003

Status:
[ Revised ]

Description:

METHODOLOGY FOR THE DEMONSTRATION OF COMPATIBILITY WITH REED FDM SYSTEMS ON THE A.C. & D.C RAILWAYS

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
SUPERSEDED BY NR/SP/SIG/50015

This document covers RR type reed FDM circuits installed on a.c. and d.c. electrified Railtrack controlled infrastructure.

Westinghouse FDM-NV and older type 'R' systems are not covered by this document.

Purpose

The purpose of this document is to provide a methodology to demonstrate compatibility with reed FDM systems installed on the a.c. and d.c. electrified railway on Railtrack controlled infrastructure. This is achieved by:

• Providing a methodology to calculate the longitudinal voltage produced in the cable cores forming a reed FDM circuit.

• Providing a model to determine the voltage across a reed FDM receiver.

• Providing a methodology to define the permissible current in the traction supply.

• For reasonable worse case infrastructure conditions train current limits are defined.

This characterisation will take the form of a permissible train current which can then be compared to EMI the footprint of a piece of traction or rolling stock to enable a case to be made. Methods are included to analyse intact and faulty infrastructure.

The aim of this document is to provide a methodology for the demonstration of electromagnetic compatibility of reed FDM systems installed on Railtrack routes.

The interference mechanisms to be considered are conductive, capacitive and inductive coupling. The coupling is between the traction supply & return conductors and the lineside cables.


Edition : 1
File Size : 1 file , 310 KB
Number of Pages : 34
Published : 02/01/2003

History

NR NR/GN/SIG/50015 ISSUE 3
Published Date: 09/05/2020
Methodology for the Demonstration of Electrical Compatibility with Reed FDM Systems on the AC and DC Railways
$18.6
NR NR/SP/SIG/50015 ISSUE 2
Published Date: 02/01/2007
Methodology for the Demonstration of Compatibility with Reed FDM Systems on the AC & DC Railways
$18.6
NR RT/E/C/50015 ISSUE 1
Published Date: 02/01/2003
METHODOLOGY FOR THE DEMONSTRATION OF COMPATIBILITY WITH REED FDM SYSTEMS ON THE A.C. & D.C RAILWAYS
$18.6

Related products

NR NR/L3/CIV/006/3G ISSUE 2
Published Date: 09/03/2022
Structures, Tunnels and Operational Property Examinations: Examination of Operational Property Structures, Fabric and M&E - Reporting and Recording of Examinations in Citadel
$24.3
NR BRS-SM 420 ISSUE B
Published Date: 11/04/1993
Traceability Codes
$5.7
NR NR/L3/NDS/308/LMB4.7 ISSUE 1
Published Date: 03/03/2012
IGA MkII (Corus Rail Train) 91 m – 216 m Rails
$7.5
NR NR/L3/MTC/PL0175/08 ISSUE 4
Published Date: 09/04/2010
Infrastructure Maintenance Planning Handbook - Reprioritisation
$5.7

Best-Selling Products