NR RT/E/P/10024 ISSUE 4 PDF

NR RT/E/P/10024 ISSUE 4 PDF

Name:
NR RT/E/P/10024 ISSUE 4 PDF

Published Date:
08/01/2004

Status:
[ Active ]

Description:

Signallers Operating Guide for the Use of the IECC Signalling Workstation (aka NR/SP/SIG/10024)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$35.4
Need Help?
PDF ONLY

This procedure is applicable to the format of information displayed on, and the commands available at, an IECC Signalling Workstation.

PURPOSE

An IECC signalling workstation, usually known as a signaller's workstation, provides facilities for the control of signalling and train movements on a section of railway. Indications of the state of the railway are provided by Visual Display Units, and controls are operated by means of trackerball and/or keyboard commands.

In most cases Automatic Route Setting (ARS) is provided, enabling regular timetabled train movements to be controlled automatically with the minimum of intervention by the signaller.

In IECC Upgrade 003 (or later), ARS is also used to perform SPAD detection. The part of ARS that performs SPAD detection is known as the Subsystem for SPAD Detection (SSD).

These instructions describe the operation of the various facilities available on the signaller's workstation. Features specific to IECC Upgrade 001 (or later) are identified through use of italic text.

Some of the facilities described are not yet available with the current version of the IECC. Such facilities are identified through use of underlined text.

All examples given are fictitious.


Edition : 4
File Size : 1 file , 370 KB
Number of Pages : 106
Published : 08/01/2004

History


Related products

NR NR/L2/RSK/290 ISSUE 2
Published Date: 09/04/2021
Business Continuity Management (BCM) (aka NR/L2/OPS/290)
$13.2
NR NR/L2/SIG/30017/K ISSUE 1
Published Date: 09/05/2009
Requirements for Level Crossings - Operation, Maintenance and Inspection of Level Crossings
$7.5
NR NR/L3/SIG/10064/GI/U033 ISSUE 4
Published Date: 06/04/2022
General Instructions to Staff Working on S&T Equipment: Use of Monitoring and Test Equipment
$5.7
NR NR/GN/SIG/11116 ISSUE 2
Published Date: 08/26/2008
Assessment of Signalling Systems Before Signalling Design Alterations
$7.5

Best-Selling Products

ASSE (Plumbing) 1001-2008
Published Date: 02/18/2008
Performance Requirements for Atmospheric Type Vacuum Breakers
$13.5
ASSE (Plumbing) 1001-2017
Published Date: 06/01/2017
Performance Requirements for Atmospheric Type Vacuum Breakers
$13.5
ASSE (Plumbing) 1001-2021
Published Date: 11/01/2021
Performance Requirements for Atmospheric Type Vacuum Breakers
$13.5
ASSE (Plumbing) 1002-2008
Published Date: 04/28/2008
Performance Requirements for Anti-Siphon Fill Valves for Water Closet Tanks
$13.5
ASSE (Plumbing) 1002-2020/ASME A112.1002-2020/CSA B125.12:20
Published Date: 04/01/2020
Anti-Siphon Fill Valves for Water Closet Tanks
$25.5
ASSE (Plumbing) 1003-2009
Published Date: 09/28/2009
Performance Requirements for Water Pressure Reducing Valves for Domestic Water Distribution Systems
$13.5