NR RT/E/P/19000 ISSUE 2 PDF

NR RT/E/P/19000 ISSUE 2 PDF

Name:
NR RT/E/P/19000 ISSUE 2 PDF

Published Date:
04/01/2004

Status:
[ Withdrawn ]

Description:

Management of Signalling Equipment Technical Advice Notices (SIGTAN000) (aka NR/SP/SIG/19000)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
W/D * PDF ONLY

This procedure shall apply to the promulgation of professional best practice on technical issues to Network Rail's contractors, suppliers and its own Engineers concerning any signalling equipment installed on Network Rails infrastructure.

Purpose

This procedure defines the arrangements for managing the production, authorisation and distribution of SIGTANs. These controlled standards are the method by which Network Rail will advise its own Engineers and it's contractors about changes to signalling equipment and problems with signalling equipment in service. SIGTANs contain advice based on lessons learnt and current best practice. They are not mandatory, but may subsequently give rise to a change in Network Rail company standards.


Edition : 2
File Size : 1 file , 190 KB
Number of Pages : 9
Published : 04/01/2004

History


Related products

NR NR/L2/ELP/21048 ISSUE 2
Published Date: 09/02/2017
Maintenance of Positive Conductor Rail and Traction Cables for DC Conductor Rail Systems
$7.5
NR BRS-SM 576 ISSUE A
Published Date: 07/13/1981
Swing Nose Crossing MK 6 Drive Lock Mechanism (Shown Set for 1 in 21 Layout)
$5.7
NR BRS-SE 46/4
Published Date: 11/04/1959
Electro-Magnetic-Indicator Counterbalance Grub Screw
$5.7
NR NR/L2/SIG/11752/PART L ISSUE 2
Published Date: 08/01/2001
Train Detection Handbook Part L: Operating Specification
$5.7

Best-Selling Products