NR RT/E/P/24010 ISSUE 1 PDF

NR RT/E/P/24010 ISSUE 1 PDF

Name:
NR RT/E/P/24010 ISSUE 1 PDF

Published Date:
11/01/1997

Status:
[ Active ]

Description:

Management of Warnings and Alarms Received from Trackside Pantograph Monitoring Equipment (aka NR/SP/ELP/24010)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This procedure applies to all Panchex IIIa trackside pantograph monitoring systems operating on 25 kV overhead line equipment managed by Railtrack.

Purpose

This document states the procedure for disseminating contact wire uplift data from trackside pantograph monitoring equipment and for taking action as a result of that data.

Application of this procedure will extend the operating life of the OLE and pantograph and reduce the incidence of dewirements.

This document does not consider the collection or analysis of the uplift data, the methods for generating alarm uplift levels for triggering reports, nor the value of those levels.


Edition : 1
File Size : 1 file , 160 KB
Number of Pages : 12
Published : 11/01/1997

History


Related products

NR NR/L2/TRK/053/MOD01 ISSUE 4
Published Date: 12/03/2022
Inspection and Repair to Control the Risk of Derailment at Switches: Module 1: Glossary and Tooling
$13.2
NR T34009 ISSUE 3
Published Date: 12/07/2002
Lineside & on Track Equipment Typical Circuits TPWS - Control Circuits for Retro Fitment to Relay Operated Signalling Converging Approach 2
$5.7
NR BRS-SM 208/114 ISSUE B
Published Date: 03/29/1985
Stud Driving for Lock Bar Complete with Bolts
$5.7
NR BRS-SM 5864
Published Date: 07/02/1986
Apparatus Case Small Parts List for Roof Assembly
$5.7

Best-Selling Products

ISO/TS 10004:2010
Published Date: 04/15/2010
Quality management - Customer satisfaction - Guidelines for monitoring and measuring
$42.6
ISO/TS 10020:2022
Published Date: 08/31/2022
Quality management systems - Organizational change management - Processes
$66.9
ISO/TS 10128:2009
Published Date: 07/01/2009
Graphic technology - Methods of adjustment of the colour reproduction of a printing system to match a set of characterization data
$23.1
ISO/TS 10128:2023
Published Date: 11/01/2023
Graphic technology - Methods of adjustment of the colour reproduction of a printing system to match a set of characterization data
$37.2
ISO/TS 10272-2:2006
Published Date: 01/15/2006
Microbiology of food and animal feeding stuffs - Horizontal method for detection and enumeration of Campylobacter spp. - Part 2: Colony-count technique
$30.9
ISO/TS 10272-3:2010
Published Date: 03/01/2010
Microbiology of food and animal feeding stuffs - Horizontal method for detection and enumeration of Campylobacter spp. - Part 3: Semi-quantitative method
$33.6