NR RT/E/P/27144 ISSUE 1 PDF

NR RT/E/P/27144 ISSUE 1 PDF

Name:
NR RT/E/P/27144 ISSUE 1 PDF

Published Date:
12/01/2004

Status:
[ Inactive ]

Description:

Examination and Adjustment of Balance Weight Terminations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
INAC NO S/S

Introduction

This Procedure covers the initial examination, routine examination and re-adjustment procedure for Balance Weight Terminations of Mark I design Overhead Line Equipment to ensure free movement over the working temperature range of 0ºF to 100ºF.

Initial examination will be carried out in all cases of wire renewal or major alterations in the tension length. Otherwise all examinations shall be routine examinations.

Subject to clause 1.2, the balance weight termination assembly is to be examined, as described below, every 2 years.

All dimensions are to be recorded on the Balance Weight Termination Record Sheet (see appendix for specimen).

All turnbuckles, compensating plates, pins, washers and split pins which are badly worn, burned or corroded must be renewed. All split pins removed must be renewed. All clevis pins removed and all turnbuckles are to be greased with Castrol 'Rustilo' (B.R. Catalogue No. 27/3435).


Edition : 1
File Size : 1 file , 450 KB
Number of Pages : 33
Published : 12/01/2004

History


Related products

NR NR/CIV/SD/1228B ISSUE A
Published Date: 03/07/2020
Z-Type Underbridges: Main Girder: Steelwork Details Steel Floor - Sheet 2 of 2
$5.7
NR NR/CIV/SD/4461 ISSUE 2
Published Date: 03/05/2021
Frame Covered Footbridge Series 4400: Full Structure Sections & Elevations Sheet 2
$5.7
NR NR/GN/SIG/19801 ISSUE 1
Published Date: 02/01/2006
Sittingbourne - Sheerness: Control & Use of VHLC Local Control Panels
$18.6
NR NR/CIV/SD/4538
Published Date: 03/05/2021
Frame Open Footbridge Series 4500: Service Routing - Mechanical
$5.7

Best-Selling Products