Name:
NR RT/E/P/27145 ISSUE 1 PDF
Published Date:
12/01/2004
Status:
[ Inactive ]
Publisher:
Network Rail
Introduction
This procedure covers the fitting and removal of OHL connections to or from high or low voltage terminals or transformers.
This procedure applies to all structure mounted 25kV and 6.25kV Booster Transformers and all structure mounted Auxiliary Supply Transformers, firstly with threaded stems at least 63mm (2.5") long and secondly with threaded stems less than 63mm (2.5") long.
| Edition : | 1 |
| File Size : | 1 file , 300 KB |
| Number of Pages : | 8 |
| Published : | 12/01/2004 |