NR RT/E/P/27181 ISSUE 1 PDF

NR RT/E/P/27181 ISSUE 1 PDF

Name:
NR RT/E/P/27181 ISSUE 1 PDF

Published Date:
12/04/2004

Status:
[ Withdrawn ]

Description:

The Use of Minor New Works Contract for Electrical, Cable and Mechanical Installations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
W/D * PDF ONLY

This procedure describes the activities and responsibilities involved in the letting of Minor New Works Term Contracts for Electrical, Cable and Mechanical installations at area level through the use of Specification S-PM-375 and its associated Schedule of Rates.


Edition : 1
File Size : 1 file , 230 KB
Number of Pages : 27
Published : 12/04/2004

History


Related products

NR NR/L3/INF/AK0025 ISSUE 2
Published Date: 08/26/2008
Asset Data Maintenance Reference Data Change (aka NR/L3/AMG/AK0025)
$13.2
NR NR/L3/MTC/RCS0216/OT06 ISSUE 3
Published Date: 03/03/2012
Risk Control Manual: Maintain Vegetation - Mechanised Flailing, Mowing, Mulching, Cutting
$5.7
NR NR/L3/CIV/140/160N ISSUE 2
Published Date: 12/05/2009
Model Clause 160N: General Requirements for Structural Timber
$5.7
NR NR/L3/ELP/27406/MOD H ISSUE 1
Published Date: 12/03/2011
Engineering Deliverable Requirements for Electrical Power Asset Design: AC Networks (25kV AC)
$5.7

Best-Selling Products