NR RT/E/S/10135 ISSUE 3 PDF

NR RT/E/S/10135 ISSUE 3 PDF

Name:
NR RT/E/S/10135 ISSUE 3 PDF

Published Date:
04/01/2004

Status:
[ Inactive ]

Description:

Train Protection & Warning System (TPWS)Track Sub-System Works Testing Requirements (aka NR/SP/SIG/10135)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
INACTIVE * PDF ONLY

This document applies to the signal works testing of the Thales Communications UK (Thales) TPWS track sub-system, the NRS Failure Indication Unit (FIU) for TPWS and the associated d.c. to d.c. converter for the FIU. For TPWS+ fitments, the requirements for TPWS OSS with complex approaches outlined in this document shall be followed.

The Network Rail Company Standard RT/E/G/11730 - Signal Works Testing, will apply to the testing of the alterations for interfacing TPWS to existing and new signalling systems and their associated power supplies.

This document does not apply to signal maintenance testing. It does not apply to the trainborne equipment. It does not apply to the signal works testing of the TPWS RETB Trackside Radio Control Unit (TRCU) equipment, or the TPWS UPS.

PURPOSE

This Company Specification has been prepared to provide Signal Works Testers with details of the minimum requirements for the testing and commissioning procedures necessary to validate the intended functionality and to verify the installation of the Train Protection and Warning System (TPWS).


Edition : 3
File Size : 1 file , 1.1 MB
Number of Pages : 38
Published : 04/01/2004

History


Related products

NR NR/L2/ELP/27009/MOD C66 ISSUE 1
Published Date: 12/03/2011
Renew Arc Damaged Registration Arms in Headspan Assemblies
$5.7
NR NR/L3/ELP/27240/NR/DIST C03D ISSUE 6
Published Date: 06/03/2023
Maintenance of VCB Switchgear
$13.2
NR BRS-SM 604 ISSUE A
Published Date: 03/10/1978
Permanent Speed Restriction Advance Warning Board Electrically Illuminated
$5.7
NR NR/L3/OPS/045/1.03 ISSUE 1
Published Date: 09/07/2019
National Operating Procedure (NOP) 1.03: Personal Use of Technology, IT and Domestic Radios in Operational Locations
$5.7

Best-Selling Products

Clean Water Act: 25th Anniversary Edition
Published Date: 01/01/1997
$21.3
WEF 0MFD20
Published Date: 01/01/1992
Design and Construction of Urban Stormwater Management Systems, MOP FD-20
$22.5