NR RT/E/S/10178 ISSUE 1 PDF

NR RT/E/S/10178 ISSUE 1 PDF

Name:
NR RT/E/S/10178 ISSUE 1 PDF

Published Date:
04/01/2004

Status:
[ Active ]

Description:

TPWS in Areas where the Control of Train Movements is by RETB Signalling (aka NR/SP/SIG/10178)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$35.4
Need Help?
PDF ONLY

This Standard applies to the four geographic areas where RETB is installed. These are the far North of Scotland, the West of Scotland, Mid Wales and East Anglia.

PURPOSE

This specification mandates the requirements for installing Train Protection and Warning System (TPWS) in areas where the control of movement of trains is by Radio Electronic Token Block (RETB). The specification has a number of sections dealing with the requirements for:

1. describes the overlay of TPWS on routes operated by the RETB system of signalling and outlines the requirements by reference to supporting documentation. It also specifies the following:

• selection of which Stop Boards require TPWS fitment;

• the operational (functional and safety) requirements for the overlay of TPWS on the RETB system.

2. the scheme design requirements for the allocation and placement of equipment that is required for the implementation of TPWS within RETB signalled areas.

3. the interface requirements for fitment of TPWS to an RETB signalled line. The document details a suite of standard interface designs that will assist the designer in the production of site-specific designs.

4. the creation and management of Site Configuration Information (SCI) for the programming of the Trackside Radio Control Module (TRCM), which forms part of the TPWS Trackside Radio Control Unit (TRCU) utilised at RETB Token Exchange Points (TEPs).

5. the installation requirements for a TPWS/RETB system, which allows TPWS to be fitted to RETB signalled lines.

6. this document defines the works testing requirements that will provide evidence of the performance of TPWS operating in an RETB signalled site.


Edition : 1
File Size : 1 file , 660 KB
Number of Pages : 113
Published : 04/01/2004

History


Related products

NR X03805 ISSUE 3
Published Date: 12/01/2008
AHBC Typical Circuits Double Line Bi-Directional with Signal Regulation, Separate ATC and Over-Run Call by Track Circuit - Circuit Index
$5.7
NR NR/L2/ENV/122 ISSUE 2
Published Date: 03/04/2023
Biodiversity
$13.2
NR NR/L2/SIG/11201/MOD B21 ISSUE 1
Published Date: 06/05/2021
Signalling Design Handbook: Legacy and Specialised Equipment Engineering for Lever Frame and Traditional Signal Boxes
$24.3
NR BRS-SM 474
Published Date:
4" Centres Ground Frame Details of Cover
$5.7

Best-Selling Products

NEMA/MITA CSP 2-2021
Published Date: 2021
Lifecycle Best Practices Framework for Medical Imaging Devices
$14.7
NEMA/MITA DD P1-2019
Published Date: 08/01/2019
White Paper on Understanding the Limited Usefulness of Detector Dose Measurements in Modern Medical X-ray Imaging Equipment
$24.6
NEMA/MITA RMD P1-2019
Published Date: 01/30/2019
White Paper on Considerations for Remanufacturing of Medical Imaging Devices
$14.7
NEMA/MITA RSSTCD 1-2019
Published Date: 2019
White Paper on Radiation Safety Specification and Testing Comparison Document for Medical X-Ray Imaging Devices General Radiography and Fluoroscopy, and Interventional Fluoroscopy
$28.8
NEMA/MITA RSSTCD 2-2020
Published Date: 2020
White Paper on 21 CFR Subchapter J to IEC Comparison Table for Medical X-Ray Imaging Devices Mammography
$30
NEMA/MITA SAC 1-2020
Published Date: 2020
White Paper on Understanding Accountability in Medical Device Servicing
$14.7