Name:
NR RT/E/S/11189 ISSUE 3 PDF
Published Date:
06/01/2005
Status:
[ Active ]
Publisher:
Network Rail
The tests described shall be used in full whenever a comprehensive test of the installation's facilities is required.
Crossings equipped with direct CB or Public Switched Telephone Network (PSTN) telephones shall be tested in a similar manner.
Purpose
This instruction details the tests and inspection required for the commissioning of new and altered level crossing installations equipped with a level crossing telephone system.
| Edition : | 3 |
| File Size : | 1 file , 230 KB |
| Number of Pages : | 17 |
| Published : | 06/01/2005 |