NR RT/E/S/24017 ISSUE 1 PDF

NR RT/E/S/24017 ISSUE 1 PDF

Name:
NR RT/E/S/24017 ISSUE 1 PDF

Published Date:
04/01/2003

Status:
[ Revised ]

Description:

Control Room Design Specification, Process & Guidance (aka NR/SP/ERG/24017)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
PDF ONLY

The standard is applicable to new Control Rooms, Upgraded Control Rooms (Refurbished sites, see definitions) and temporary Control Rooms (Stagework sites).

The requirements presented in the main body of the text cover both new sites and refurbishment sites – the additional constraints associated with refurbishment sites are addressed via checklists in Appendix 1.

The standard deals only with those activities which take place within the confines of the Control Suite – control room & associated rooms and spaces.

The standard is based on Requirements and Recommendations contained within the published Parts of ISO 11064 ‘The Ergonomic Design of Control Centres', ergonomics standards, Network Rail standards, relevant UK Health & Safety Regulations and best practice established within and outside of the rail industry.

The standard does not offer detailed Requirements or Recommendations for Control Room ‘Workstations' or ‘Control and Displays'. These are provided in separate Network Rail standards.

The standard shall be used by those involved in, or responsible for, the design, specification, delivery, management and audit of Network Rail Control Rooms. The standard has relevance to ergonomists and non-ergonomists, however it assumes an appropriate level of ergonomics competence is made available during the application and delivery of ergonomics techniques, processes and procedures.

Purpose

This standard presents ergonomics Requirements and Recommendations for the design, arrangement and organisation of Network Rail Control Rooms and closely associated areas. The standard covers all the main classes of Control Room including Signalling, Electrical, Zone, Station, Dispatch, Maintenance and Telecommunications activities making reference to the Operational Property Engineering Recommendations notes for Environmental Design Criteria. This standard is intended for control rooms where VDU's are used. However, many of the requirements are common to non -VDU environments such as those with NX Panels and lever frames.

The standard is intended to assist Network Rail Project Managers who have responsibilities for Control Room Design Programmes and/or their delivery. It would be anticipated that any work undertaken in connection with the implementation of this standard would be conducted by suitably qualified individuals. This standard shall also assist Project Managers in managing an ergonomics input.


Edition : 1
File Size : 1 file , 410 KB
Number of Pages : 56
Published : 04/01/2003

History

NR RT/E/S/24017 ISSUE 2
Published Date: 04/01/2004
Control Room Design: Specification, Process & Guidance (aka NR/SP/ERG/24017)
$24.3
NR RT/E/S/24017 ISSUE 1
Published Date: 04/01/2003
Control Room Design Specification, Process & Guidance (aka NR/SP/ERG/24017)
$24.3

Related products

NR NR/SMS/APPENDIX ISSUE 13
Published Date: 12/02/2023
Signal Maintenance Specifications (SMS): Appendices
$74.4
NR E10018/10 ISSUE 2
Published Date: 09/01/2004
Typical Circuits Former Western Region Point Circuits WZR - Self Restored Points
$5.7
NR NB 079 ISSUE 1
Published Date: 09/01/2007
Alignment of LED Long- and Medium-Range Signals
$5.7
NR NR/CIV/SD/4521 ISSUE 2
Published Date: 03/05/2021
Frame Open Footbridge Series 4500: Plan - Main Deck Level
$5.7

Best-Selling Products

NSF/ANSI 12-2018
Published Date: 2018
Automatic Ice Making Equipment
$64.5
NSF/ANSI 12-2023
Published Date: 2023
Automatic Ice Making Equipment
$64.5
NSF/ANSI 12-2024
Published Date: 2024
Automatic Ice Making Equipment
$64.5
NSF/ANSI 13-2017
Published Date: 05/23/2017
Refuse Processors and Processing Systems
$52.8
NSF/ANSI 13-2020
Published Date: 03/01/2021
Refuse Processors and Processing Systems
$52.8
NSF/ANSI 13-2024
Published Date: 08/01/2024
Refuse Processors and Processing Systems
$52.8