NR RT/E/WI/00105 ISSUE 2 PDF

NR RT/E/WI/00105 ISSUE 2 PDF

Name:
NR RT/E/WI/00105 ISSUE 2 PDF

Published Date:
08/01/2004

Status:
[ Inactive ]

Description:

AzLM Axle Counter System Risk Based Maintenance (aka NR/WI/SIG/00105)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
INAC NO S/S

This maintenance specification applies to the Alcatel AzLM type Axle Counter system.

This maintenance specification DOES NOT include tasks associated with the following:

• Testing activities for earth leakage detection.

• Cable testing. 

• Maintenance of power supply equipment.

This maintenance specification shall be applied where implementation of Risk-Based Maintenance has been authorised in accordance with Network Rail Company Specification RT/E/S/10662 ‘Process for the Introduction of New or Revised Maintenance Regimes for Signalling Assets'.

The frequency of application of the tasks defined in this specification is defined in the RT/E/S/10661, ‘Signalling Maintenance Task Intervals'.

Purpose

To detail the maintenance tasks required for the AzLM Axle Counter System risk-based maintenance regime.


Edition : 2
File Size : 1 file , 840 KB
Number of Pages : 27
Published : 08/01/2004

History


Related products

NR NR/L1/OHS/051 ISSUE 6
Published Date: 12/05/2015
Drugs and Alcohol Policy
$13.2
NR E10000/1/5 ISSUE B
Published Date: 10/10/1980
Signal Control Circuits - Aspects Sequence (1)
$5.7
NR NR/CIV/SD/640 ISSUE C
Published Date: 09/02/2017
Steelwork Repairs: Typical Top Hat Strengthening Detail Sheet 1 of 2
$5.7
NR NR/L2/RSE/CONM/001/01 ISSUE 2
Published Date: 12/02/2023
Construction Management for Projects: Assurance
$7.5

Best-Selling Products