Name:
NR RT/E/WI/00112 ISSUE 1 PDF
Published Date:
09/01/2004
Status:
[ Active ]
Publisher:
Network Rail
The following instructions apply specifically to Cauldwell Depot TSC for the isolation and earthing of Cauldwell Depot TSC complete including interconnector cable BE/CL and outgoing feeder cable CL/635.
Purpose
This document sets out the instructions to be carried out in connection with the issue and cancellation of High Voltage Permits-to-Work in accordance with RT/E/S/21067, to enable work to be carried out on specific items of the high voltage equipment.
| Edition : | 1 |
| File Size : | 1 file , 200 KB |
| Number of Pages : | 13 |
| Published : | 09/01/2004 |