Name:
NR RT/E/WI/27090 ISSUE 1 PDF
Published Date:
12/04/2004
Status:
[ Inactive ]
Publisher:
Network Rail
Introduction
This Instruction covers the installation of the CCL/'Reliable' QUICK - SPLICE Automatic mid span connector for H.D. Copper, Cadmium Copper and AWAC stranded conductor wires in overhead line equipment.
These connectors replace splices to Cat. Nos 91/1925, 91/1926 and 91/11991 which are no longer available.
This document complies with the CCL Technical Data sheet TD 200/10, 201/10, 203/10 "Automatic Mid Span Fitting for Overhead Line Conductors".
| Edition : | 1 |
| File Size : | 1 file , 360 KB |
| Number of Pages : | 23 |
| Published : | 12/04/2004 |