Name:
NR RT/E/WI/27100 ISSUE 1 PDF
Published Date:
12/04/2004
Status:
[ Inactive ]
Publisher:
Network Rail
The following instructions apply to all 25kV switching stations incorporating vacuum C.B.s except that THEY DO NOT APPLY TO THOSE SWITCHING STATIONS LISTED IN APPENDIX A FOR WHICH SEPARATE INSTRUCTIONS ARE IN FORCE.
Purpose
This document sets out the instructions to be carried out in connection with the issue and cancellation of High Voltage Permits to Work or Sanction for Test, to enable work/testing to be carried out on this equipment or the connections thereto.
| Edition : | 1 |
| File Size : | 1 file , 250 KB |
| Number of Pages : | 36 |
| Published : | 12/04/2004 |