Name:
NR RT/E/WI/27110 ISSUE 1 PDF
Published Date:
12/04/2004
Status:
[ Inactive ]
Publisher:
Network Rail
Purpose
The following instructions apply only to the isolation transformers and their associated equipment at West London Junction I.T.S.L., Mitre Bridge Junction, and Scrubs Lane installations and relate to the procedures detailed in BR 12011/1 to be carried out in connection with the making out and cancelling of Permits to Work and Sanctions for Test for high voltage apparatus.
Isolation and earthing instructions for the Structure Mounted Outdoor Switchgear at West London Junction is covered by EHQ/IN/S/036 Instructions for Isolation and Earthing of SMOS Location Not Adjacent to Overhead Line Equipment, Using BR 12011.
| Edition : | 1 |
| File Size : | 1 file , 280 KB |
| Number of Pages : | 23 |
| Published : | 12/04/2004 |