NR RT/SIN/071 ISSUE 1 PDF

NR RT/SIN/071 ISSUE 1 PDF

Name:
NR RT/SIN/071 ISSUE 1 PDF

Published Date:
08/01/1999

Status:
[ Withdrawn ]

Description:

Test for Locking of Electro-Hydraulic Point Systems

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

This Notice applies to all points operated by an electro-hydraulic power pack, including clamp locks, swing nose crossings, non-lockable yard points and Joss Lock points (electro-pneumatic points mechanism converted to electro-hydraulic operation).

Purpose

A number of BR 817 electro-hydraulic power packs have been identified with a design defect which may give an ambiguous result if the method for checking the system for the presence of air as given in Appendix B of RT/SIN/064 (Issues 1 & 2) is followed. Furthermore, the test itself has been found to be unreliable when used with the more recent versions of power pack. This Notice prescribes a revised test method which will detect air and directs that it shall be used on all electro-hydraulic points.


Edition : 1
File Size : 1 file , 180 KB
Number of Pages : 13
Published : 08/01/1999

History


Related products

NR BRS-SM 232 ISSUE D
Published Date: 02/22/1990
1 1/4 Screwed End with Flange for Insulated Joint
$5.7
NR T04041 ISSUE 1
Published Date: 03/05/2011
Lineside & on Track Equipment Typical Circuits Train Detection Interrupters - Dual Immune TC Interrupter Circuit for Use on Wide to gauge Trap Points
$5.7
NR NR/L3/MTC/RCS0216/TK11 ISSUE 3
Published Date: 03/03/2012
Risk Control Manual: Working with Ballast - Regulate, Glue, Shoulder Clean, Contaminate, & Wet Beds
$5.7
NR X01020 ISSUE 1
Published Date: 02/06/1999
AHBC Typical Circuits Timing Circuits Double Line Bi-Directional
$5.7

Best-Selling Products