NR SAO-ARS-GD-3 ISSUE 2 PDF

NR SAO-ARS-GD-3 ISSUE 2 PDF

Name:
NR SAO-ARS-GD-3 ISSUE 2 PDF

Published Date:
10/29/1999

Status:
[ Active ]

Description:

ARS Business Priorities Guide

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

PURPOSE

The purpose of this document is to provide sufficient background to enable the application of the business priority levels recently engineered into the ARS system. Business priorities allow a more flexible approach to the allocation of train service priorities by the addition of information via the Time Table Processor.

This document seeks to describe the operation of this additional system of priorities. It does this through briefly describing the history of the contract under which the work was carried out, by describing conventional ARS regulation and also by describing the relationship between the business priority levels and conventional ARS regulation. In conclusion, some general guidelines to the application of the facility are presented.


Edition : 2
File Size : 1 file , 44 KB
Number of Pages : 14
Published : 10/29/1999

History


Related products

NR T28340 ISSUE 1
Published Date: 04/07/2007
Lineside & on Track Equipment Typical Circuits Signals & Indicators Colour Light: Lighting Circuit: 2 Aspect (Dorman LED): Min Tunnel Signal R/Y
$5.7
NR BRS-SM 2041/2 ISSUE A
Published Date: 02/11/1992
Colour Light Signals Pivot Bracket Right Hand for Footstep on 1500 Wide Signal Stage
$5.7
NR NR/L3/MTC/ME0201/CAL265 ISSUE 1
Published Date: 06/07/2008
Calibration of Optical Height & Stagger Gauge
$5.7
NR TPWS/TGN/009 ISSUE 1
Published Date: 04/06/2001
Power Supplies to TPWS at Signals Controlled from Mechanical Signal Boxes
$18.6

Best-Selling Products

ESC 60601-1-2
Published Date: 11/01/2004
IEC 60601-1-2, 2nd ed. Marking & Labeling Workbook, Version 1.0: ESC 60601-1-2 Version 1.0