NR SAO-IEC-HD-65 ISSUE 2 PDF

NR SAO-IEC-HD-65 ISSUE 2 PDF

Name:
NR SAO-IEC-HD-65 ISSUE 2 PDF

Published Date:
12/15/2003

Status:
[ Active ]

Description:

Integrated Electronic Control System Data Preparation Manual IDPM 1701 PC SPAD Monitor Reference

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

Introduction

This document introduces a reader who already understands railway signalling, engineering and its terminology to the Integrated Electronic Control Centre (IECC) PC SPAD Monitor (PSM) and its data preparation.

The main impact of the PSM on IECC data preparation is the requirement to advise Network Rail HQ of the need to reconfigure the PSM if Automatic Routesetting Subsystem (ARS) production data changes.

Note that if the PSM is converted to an IECC PC Logger (IPL) by disabling and removal of the SPAD detection and reporting facility, then site-specific data is no longer used and sections 2 and 3 of this document are not applicable.


Edition : 2
File Size : 1 file , 42 KB
Number of Pages : 9
Published : 12/15/2003

History


Related products

NR BRS-SM 2594
Published Date: 01/30/1995
Mechanical Backdrive External to 4' on L.H.S. Full Depth EV Layout Point M/C Mounted On R.H.S.
$5.7
NR NR/CIV/SD/115 ISSUE B
Published Date: 09/02/2017
Brick & Masonry Repairs: Masonry Refurbishment
$5.7
NR NR/L3/ELP/27240/NR/DIST C26J ISSUE 3
Published Date: 12/05/2020
Routine Maintenance of Track Current Relay AE1 Type P Form N
$5.7
NR NR/L3/SIG/11761/D210 ISSUE 1
Published Date: 03/31/2010
EBI Track 200 Track Circuit Condition Monitoring
$13.2

Best-Selling Products

ICML 55.1
Published Date: 2019
ICML 55.1 Standard - Part 1: Asset Management. Requirements for the Optimized Lubrication of Mechanical Physical Assets