NR SAO-IEC-HP-15 ISSUE 5 PDF

NR SAO-IEC-HP-15 ISSUE 5 PDF

Name:
NR SAO-IEC-HP-15 ISSUE 5 PDF

Published Date:
10/29/1999

Status:
[ Active ]

Description:

Integrated Electronic Control Centre Project Handbook IECC 8005 Timescale Planning

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

PURPOSE AND SCOPE OF DOCUMENT

The purpose of this document is to provide the information that a project engineer needs for planning the IECC part of a resignalling scheme.

It is assumed that SSI is part of the scheme and the relevant SSI tasks are shown where they have key dependencies with IECC tasks. The documents referenced from the SSI Applications Manua[1l] must be used to make detailed plans for the SSI work and it is not intended to supplant these documents.

The main exclusions are the trackside signalling work and any civil engineering or permanent way works involved as these are outside of the scope of this guide.


Edition : 5
File Size : 1 file , 110 KB
Number of Pages : 22
Published : 10/29/1999

History


Related products

NR NR/GN/RMVP/27702 ISSUE 3
Published Date: 03/05/2022
Plant Product Acceptance Process
$13.2
NR TWI 2T019 ISSUE 1
Published Date: 03/01/2005
How to Lower Track Under Traffic
$5.7
NR NR/L3/ELP/27241 ISSUE 7
Published Date: 03/02/2024
Fixed Plant Work Instructions
$7.5
NR NR/L3/CIV/140/075C ISSUE 2
Published Date: 03/06/2010
Model Clause 075C: Testing of Piles
$7.5

Best-Selling Products