NR SAO-SSP(002)-UG-14 ISSUE 1.1 PDF

NR SAO-SSP(002)-UG-14 ISSUE 1.1 PDF

Name:
NR SAO-SSP(002)-UG-14 ISSUE 1.1 PDF

Published Date:
03/26/2001

Status:
[ Active ]

Description:

IECC Upgrade 002 CCF Operator Briefing Note

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

Introduction

Integrated Electronic Control Centre (IECC) systems are installed and operational at eleven Railtrack Signalling Control Centres (SCCs). Feedback from Railtrack production, operations and maintenance personnel generated the need for various improvements to the IECC including the addition of new IECC functions. Railtrack HQ contracted AEA Technology Rail to develop a package of improvements and new additions to the IECC software specifically focused on the automatic routesetting capability of the IECC.

This package of improvements, designated IECC Upgrade 002, comprises software changes, enhancements and the provision of new functionality to the Automatic Routesetting Subsystem (ARS) and Timetable Processor Subsystem (TTP).

This briefing note provides the CCF operator with information on the IECC Upgrade 002 changes.


Edition : 1.1
File Size : 1 file , 47 KB
Number of Pages : 9
Published : 03/26/2001

History


Related products

NR NR/L2/CIV/005/09 ISSUE 1
Published Date: 06/02/2018
Drainage Systems Manual: Drainage Design
$18.6
NR NB 187 ISSUE 1
Published Date: 06/05/2020
Fitment of Point Securing Measures
$5.7
NR BRS-SM 509
Published Date: 01/01/1972
Rail Clamp Point Lock Terminal Block
$5.7
NR BR 1697 ISSUE 1
Published Date: 09/01/1998
Single Station - Multiple Zone Passenger Information System
$18.6

Best-Selling Products