NR SAO-SSP(002)-UG-3 ISSUE 1.1 PDF

NR SAO-SSP(002)-UG-3 ISSUE 1.1 PDF

Name:
NR SAO-SSP(002)-UG-3 ISSUE 1.1 PDF

Published Date:
03/01/2001

Status:
[ Active ]

Description:

IECC Upgrade 002 TTP Factory Tester Briefing Note

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

Introduction

Integrated Electronic Control Centre (IECC) systems are installed and operational at eleven Railtrack Signalling Control Centres (SCCs). Feedback from Railtrack production, operations and maintenance personnel generated the need for various improvements to the IECC including the addition of new IECC functions. Railtrack HQ contracted AEA Technology Rail to develop a package of improvements and new additions to the IECC software specifically focused on the automatic routesetting capability of the IECC.

This package of improvements, designated IECC Upgrade 002, comprises software changes, enhancements and the provision of new functionality to the Automatic Routesetting Subsystem (ARS) and Timetable Processor Subsystem (TTP).

This briefing note provides TTP factory testers with information on the TTP component of IECC Upgrade 002 (aka TTP Upgrade 002).


Edition : 1.1
File Size : 1 file , 41 KB
Number of Pages : 9
Published : 03/01/2001

History


Related products

NR NR/CIV/SD/2094 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: General Arrangement 9.4m Parapet Beam Left Skew 45⁰
$5.7
NR NR/SMTH/PART 08 ISSUE 4
Published Date: 12/02/2023
Signal Maintenance Testing Handbook (SMTH): Part 08
$35.4
NR BRS-SM 2251/3
Published Date: 01/21/1987
Rail Clamp Point Lock Spacer for Drive Clevis Assembly
$5.7
NR T28310 ISSUE 1
Published Date: 09/06/1997
Lineside & On Track Equipment Typical Circuits Signals & Indicators Colour Light; Lighting Circuit; 3 Aspect; R/Y/G
$5.7

Best-Selling Products

Managing Risks of Organizational Accidents
Published Date: 10/01/1997
$23.7