NR SAO-SSP(002)-UG-6 ISSUE 1.1 PDF

NR SAO-SSP(002)-UG-6 ISSUE 1.1 PDF

Name:
NR SAO-SSP(002)-UG-6 ISSUE 1.1 PDF

Published Date:
03/26/2001

Status:
[ Active ]

Description:

IECC Upgrade 002 Operations Planning Briefing Note

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-sao-ssp-002-ug-6-issue-1-1_2772901

Choose Document Language:
7.50 €
Need Help?
PDF ONLY

Introduction

Integrated Electronic Control Centre (IECC) systems are installed and operational at eleven Railtrack Signalling Control Centres (SCCs). Feedback from Railtrack production, operations and maintenance personnel generated the need for various improvements to the IECC including the addition of new IECC functions. Railtrack HQ contracted AEA Technology Rail to develop a package of improvements and new additions to the IECC software specifically focused on the automatic routesetting capability of the IECC.

This package of improvements, designated IECC Upgrade 002, comprises software changes, enhancements and the provision of new functionality to the Automatic Routesetting Subsystem (ARS) and Timetable Processor Subsystem (TTP).

This briefing note provides Railtrack Operations Planning personnel with relevant information on the TTP component of IECC Upgrade 002 (aka TTP Upgrade 002).


Edition : 1.1
File Size : 1 file , 45 KB
Number of Pages : 9
Published : 03/26/2001

History


Related products

NR NR/CIV/SD/F003/260/ADD ISSUE A
Published Date: 09/02/2017
Ballast/Cess Support Structures Form 003 Addendum
18.60 €
NR NR/CIV/SD/4452 ISSUE 2
Published Date: 03/05/2021
Frame Covered Footbridge Series 4400: Roof Level GA
5.70 €
NR SSI8003-80 ISSUE 1
Published Date: 08/01/2004
SSI Data Preparation - One Train System without Staff (aka RT/SSI/8003-80)
13.20 €
NR NR/CIV/SD/4404
Published Date: 03/05/2021
Frame Covered Footbridge Series 4400: Diversity Impact Assessment
5.70 €

Best-Selling Products