NR SAO-SSP(002)-UG-8 ISSUE 1.1 PDF

NR SAO-SSP(002)-UG-8 ISSUE 1.1 PDF

Name:
NR SAO-SSP(002)-UG-8 ISSUE 1.1 PDF

Published Date:
03/26/2001

Status:
[ Active ]

Description:

IECC Upgrade 002 Signaller ARS Briefing Note

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

Introduction

Integrated Electronic Control Centre (IECC) systems are installed and operational at eleven Railtrack Signalling Control Centres (SCCs). Feedback from Railtrack production, operations and maintenance personnel generated the need for various improvements to the IECC including the addition of new IECC functions. Railtrack HQ contracted AEA Technology Rail to develop a package of improvements and new additions to the IECC software specifically focused on the automatic routesetting capability of the IECC.

This package of improvements, designated IECC Upgrade 002, comprises software changes, enhancements and the provision of new functionality to the Automatic Routesetting Subsystem (ARS) and Timetable Processor Subsystem (TTP).

This briefing note provides signallers with information on the ARS component of IECC Upgrade 002 (aka ARS Upgrade 002).


Edition : 1.1
File Size : 1 file , 68 KB
Number of Pages : 15
Published : 03/26/2001

History


Related products

NR NR/SIN/109 ISSUE 1
Published Date: 08/27/2010
The Inspection & Measurement of Crossing Surface Vertical Profile at Uncontrolled Vehicular Level Crossings
$13.2
NR NR/CIV/SD/426 ISSUE G
Published Date: 06/01/2019
Footbridges Non-Stations: Staircase 180 Degree Turn - Trestle Support - General Arrangement
$5.7
NR NR/L2/ELP/27314/02 ISSUE 1
Published Date: 09/07/2019
Construction Assurance for Overhead Contact Systems: Installation
$7.5
NR NR/CIV/SD/350 ISSUE D
Published Date: 03/03/2018
Earthwork Drains: Standard UTX Drain Details
$5.7

Best-Selling Products