NR SCS-SSP(003)-UG-2 ISSUE 3 PDF

NR SCS-SSP(003)-UG-2 ISSUE 3 PDF

Name:
NR SCS-SSP(003)-UG-2 ISSUE 3 PDF

Published Date:
08/29/2003

Status:
[ Active ]

Description:

IECC Upgrade 003 Signaller Briefing Note

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

Introduction

Integrated Electronic Control Centre (IECC) systems are installed and operational at eleven Network Rail Signalling Control Centres (SCCs).

Following the Cullen inquiry into the Ladbroke Grove rail accident, Network Rail contracted AEA Technology Rail to introduce a Signal Passed at Danger (SPAD) Alarm into the IECC.

The SPAD Alarm is part of a package of IECC improvements, designated Upgrade 003, that comprises software changes and enhancements to the Automatic Routesetting Subsystem (ARS) and Flexible Display Subsystem (DIS).

This briefing note provides signallers with information on IECC Upgrade 003.


Edition : 3
File Size : 1 file , 420 KB
Number of Pages : 24
Published : 08/29/2003

History


Related products

NR NR/CIV/SD/2162-1 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 9.4m External Unit Left Skew 15º
$5.7
NR NR/L1/RVE/0003 ISSUE 2
Published Date: 01/01/2009
Assurance, Performance & Monitoring of Rail Vehicles & On-Track Plant
$18.6
NR X31180 ISSUE 2
Published Date: 08/07/2004
AOCL Typical Circuits Single Line Monitor Circuits (1)
$5.7
NR NR/L2/TEL/30176 ISSUE 1
Published Date: 06/05/2021
Telecoms Asset Data Requirements
$18.6

Best-Selling Products