NR SCS-SSP(003)-UG-3 ISSUE 2 PDF

NR SCS-SSP(003)-UG-3 ISSUE 2 PDF

Name:
NR SCS-SSP(003)-UG-3 ISSUE 2 PDF

Published Date:
06/03/2003

Status:
[ Active ]

Description:

Data Preparer Briefing Note

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

Introduction

Integrated Electronic Control Centre (IECC) systems are installed and operational at eleven Network Rail Signalling Control Centres (SCCs).

Following the Cullen inquiry into the Ladbroke Grove rail accident, Network Rail contracted AEA Technology Rail to introduce a Signal Passed at Danger (SPAD) Alarm into the IECC.

The SPAD Alarm is part of a package of IECC improvements, designated Upgrade 003, that comprises software changes and enhancements to the Automatic Routesetting Subsystem (ARS) and Flexible Display Subsystem (DIS).

This briefing note provides data preparers with information on IECC Upgrade 003.


Edition : 2
File Size : 1 file , 120 KB
Number of Pages : 15
Published : 06/03/2003

History


Related products

NR NR/L2/TRK/053/MOD01 ISSUE 4
Published Date: 12/03/2022
Inspection and Repair to Control the Risk of Derailment at Switches: Module 1: Glossary and Tooling
$13.2
NR BRS-SM 440/C2 ISSUE C
Published Date: 09/22/1995
Signalling Equipment Framework Battery Shelf Rail for Apparatus Cases
$5.7
NR NR/L2/ELP/27009/MOD C15 ISSUE 1
Published Date: 12/03/2011
REPLACEMENT OF ROLLER BEARINGS IN TERMINATION PULLEYS
$5.7
NR NR/CIV/SD/1331 ISSUE F
Published Date: 03/01/2019
U-Type Underbridges: Cross Girder & Trimmer Girder: Square Floor
$5.7

Best-Selling Products

Alberta Building Code - 2023
Published Date: 2024
$7.2
NRC 683161
Published Date: 01/01/2006
Alberta Building Code
NRC BLDGCODE-05
Published Date: 01/01/2005
National Building Code of Canada 2005
$7.2