NR SCS-SSP(003)-UG-4 ISSUE 4 PDF

NR SCS-SSP(003)-UG-4 ISSUE 4 PDF

Name:
NR SCS-SSP(003)-UG-4 ISSUE 4 PDF

Published Date:
01/29/2004

Status:
[ Active ]

Description:

IECC Upgrade 003 Installation Engineer Briefing Note

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

Introduction

Integrated Electronic Control Centre (IECC) systems are installed and operational at eleven Network Rail Signalling Control Centres (SCCs).

Following the Cullen inquiry into the Ladbroke Grove rail accident, Network Rail contracted AEA Technology Rail to introduce a Signal Passed at Danger (SPAD) Alarm into the IECC.

The SPAD Alarm is part of a package of IECC improvements, designated Upgrade 003, that comprises software changes and enhancements to the Automatic Routesetting Subsystem (ARS) and Flexible Display Subsystem (DIS).

This briefing note provides installation engineers with information on IECC Upgrade 003.


Edition : 4
File Size : 1 file , 140 KB
Number of Pages : 13
Published : 01/29/2004

History


Related products

NR BRS-SM 3206 ISSUE A
Published Date: 04/15/2014
RCPL Operated Point Layout with Tubular Stretcher Bars - Full Depth CV Switches CEN56/CEN56 (113A FB) - Mechanical Supplementary Drive Mounted in 4 Foot
$5.7
NR BRS-SM 3262 ISSUE A
Published Date: 04/15/2014
RCPL Operated Point Layout with Tubular Stretcher Bars - NR56 CVS switches - Mechanical Supplementary Drive Mounted External to 4 Foot
$5.7
NR BRS-SM 318/27 ISSUE B
Published Date: 11/10/1971
Independent Lock Blade for S.G.E Type HB Point Machine for Double Slip Layouts
$5.7
NR BRS-SM 2351 ISSUE A
Published Date: 06/02/1992
Electric Point Machine Fittings Switch Rail Bracket Assembly for UIC-54A&B Switch Diamonds with Separate Detector
$5.7

Best-Selling Products

Knowledge Management Fieldbook, The
Published Date: 09/15/1999
$9