NR SCS-SSP(003)-UG-6 ISSUE 2 PDF

NR SCS-SSP(003)-UG-6 ISSUE 2 PDF

Name:
NR SCS-SSP(003)-UG-6 ISSUE 2 PDF

Published Date:
06/03/2003

Status:
[ Active ]

Description:

Incident Analyst Briefing Note

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

Introduction

Integrated Electronic Control Centre (IECC) systems are installed and operational at eleven Network Rail Signalling Control Centres (SCCs).

Following the Cullen inquiry into the Ladbroke Grove rail accident, Network Rail contracted AEA Technology Rail to introduce a Signal Passed at Danger (SPAD) Alarm into the IECC.

The SPAD Alarm is part of a package of IECC improvements, designated Upgrade 003, that comprises software changes and enhancements to the Automatic Routesetting Subsystem (ARS) and Flexible Display Subsystem (DIS).

This briefing note provides incident analysts with information on IECC Upgrade 003.


Edition : 2
File Size : 1 file , 94 KB
Number of Pages : 12
Published : 06/03/2003

History


Related products

NR TWI 3G116 ISSUE 1
Published Date: 03/01/2005
How to Use Powered Trolleys
$5.7
NR NR/CIV/SD/F002/550 ISSUE B02
Published Date: 12/03/2016
Tunnels - Sprayed Concrete Lining Renewal: Form 002
$13.2
NR NR/L2/SIG/30017/D ISSUE 1
Published Date: 09/05/2009
Requirements for Level Crossings - Telephone Systems at Level Crossings
$7.5
NR E10001/31 ISSUE 1
Published Date: 09/01/2004
Typical Circuits Former Western Region Signal Control Circuits Aspect Replacement
$5.7

Best-Selling Products

NS-CEN ISO/TS 15011-6:2012/AC:2012
Published Date: 07/15/2012
Health and safety in welding and allied processes - Laboratory method for sampling fume and gases - Part 6: Procedure for quantitative determination of fume and gases from resistance spot welding - Technical Corrigendum 1 (ISO/TS 15011-6:2012/Cor 1:2012)
Free Download