NR SCS-SSP(003)-UG-8 ISSUE 4 PDF

NR SCS-SSP(003)-UG-8 ISSUE 4 PDF

Name:
NR SCS-SSP(003)-UG-8 ISSUE 4 PDF

Published Date:
01/30/2004

Status:
[ Active ]

Description:

IECC Upgrade 003 Roll Out Briefing Note

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

Introduction

Integrated Electronic Control Centre (IECC) systems are installed and operational at eleven Network Rail Signalling Control Centres (SCCs).

Following the Cullen inquiry into the Ladbroke Grove rail accident, Network Rail contracted AEA Technology Rail to introduce a Signal Passed at Danger (SPAD) Alarm into the IECC.

The SPAD Alarm is part of a package of IECC improvements, designated Upgrade 003, that comprises software changes and enhancements to the Automatic Routesetting Subsystem (ARS) and Flexible Display Subsystem (DIS).

This briefing note provides roll out information for IECC Upgrade 003.


Edition : 4
File Size : 1 file , 55 KB
Number of Pages : 13
Published : 01/30/2004

History


Related products

NR X70210 ISSUE 4
Published Date: 04/07/2007
MCB Typical Circuits 2 Barrier Detection Circuits
$5.7
NR BRS-ST 86/2
Published Date:
Cover Lifting Barrier (Auto) MK II B
$5.7
NR NR/L2/SIG/30060 ISSUE 3
Published Date: 03/03/2012
Product Specification for AzLM Axle Counter Cable
$13.2
NR BRS-SM 2351/4
Published Date: 05/22/1991
Electric Point Machine Fittings Bush for UIC-54A&B Switch Diamonds Fitted with Point Machines
$5.7

Best-Selling Products

Dyeing Primer
Published Date: 01/01/1981
$6