NR SCS-SSP(003)-UG-9 ISSUE 1 PDF

NR SCS-SSP(003)-UG-9 ISSUE 1 PDF

Name:
NR SCS-SSP(003)-UG-9 ISSUE 1 PDF

Published Date:
04/15/2003

Status:
[ Active ]

Description:

Train Announcer Briefing Note

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

Introduction

Integrated Electronic Control Centre (IECC) systems are installed and operational at eleven Network Rail Signalling Control Centres (SCCs)

Following the Cullen inquiry into the Ladbroke Grove rail accident, Network Rail contracted AEA Technology Rail to introduce a Signal Passed at Danger (SPAD) Alarm into the IECC.

The SPAD Alarm is part of a package of IECC improvements, designated Upgrade 003, that comprises software changes and enhancements to the Automatic Routesetting Subsystem (ARS) and Flexible Display Subsystem (DIS)

This briefing note provides train announcers with information on IECC Upgrade 003.


Edition : 1
File Size : 1 file , 93 KB
Number of Pages : 9
Published : 04/15/2003

History


Related products

NR NR/L2/TRK/053/MOD01 ISSUE 4
Published Date: 12/03/2022
Inspection and Repair to Control the Risk of Derailment at Switches: Module 1: Glossary and Tooling
$13.2
NR NR/CIV/SD/2516 ISSUE B
Published Date: 09/02/2017
Modular Overbridge Design: Reinforced Earth Abutment and Cill Details
$5.7
NR SSI8003-65C ISSUE 7
Published Date: 09/05/2015
Swinging Overlaps - Chapter C: Examples 3 & 4
$18.6
NR T25705 ISSUE 1
Published Date: 03/06/2010
Lineside & on Track Typical Circuits Points - Hy-Drive - Single End Location Control and Detection Line Circuits
$5.7

Best-Selling Products

SMACNA 1378
Published Date: 01/01/1995
Thermoplastic Duct (PVC) Construction Manual
$42
SMACNA - TAB Procedural Guide
Published Date: 2024
$36