Name:
NR SSI8003-79 ISSUE 7 PDF
Published Date:
09/01/2018
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This document covers special controls required in signal aspects which are not dealt with in SSI8003-10G and SSI8003-83. The included controls are covered under the following main section headings:
2 Proving of Signal Ahead Replaced
3 Tunnel and Viaduct Control
4 Overrun Detection
5 Override of Signal Lamp Proving
6 Closing Up Controls and Consecutive Single Yellows
| Edition : | 7 |
| File Size : | 1 file , 510 KB |
| Number of Pages : | 28 |
| Published : | 09/01/2018 |