Name:
NR SSI8505C ISSUE 4 PDF
Published Date:
02/01/2002
Status:
[ Revised ]
Publisher:
Network Rail
Introduction This chapter defines the processes to be adopted for the production of Data for new SSI schemes or for changes to commissioned schemes.
This document also gives guidance in applying those requirements using the SSI Design Workstation (DWS). All DWS operations shall be in accordance with the latest issue of GS/SI8300. Alternative data preparation tools may be utilised subject to safety approval being granted by Railtrack for their use.
| Edition : | 4 |
| File Size : | 1 file , 130 KB |
| Number of Pages : | 21 |
| Published : | 02/01/2002 |