NR SSIDIS129 ISSUE 8 PDF

NR SSIDIS129 ISSUE 8 PDF

Name:
NR SSIDIS129 ISSUE 8 PDF

Published Date:
03/22/2012

Status:
[ Active ]

Description:

Crossing Stopping/Non Stopping Switch Data & Non Provision of Power on Input (MSL Crossings Only)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This document relates to the data for the Stopping/Non-stopping controls to be commissioned in the Horsham scheme for the MSL Crossing at Warnham.

The data is an alternative to that shown in SSI8003-102F Section 1 which is based on the "AHBC Typical Circuits" Issue 2.0 as shown on sheet X03620. Changes will be required to the data in the following Sections of SSI8003-102G and –104D; Section 2 (X03600), Section 4 (X04200), Section 5 (X04400), Section 6 (X04500), Section 7 (X04600) and Section 8 (X04700). Consequential changes may also be required in the same Sections of SSI8003-104D.

For MSL Crossings in general the power arrangements are not dependent on batteries at the trackside and consequently the Power On input, monitoring the 110 volts a.c. supply to the charger, is not required. Changes will be required to SSI8003-106.

PURPOSE OF PAPER

To show the data to be provided when using a Stopping/Non-stopping 2 position Switch instead of the one-shot button control shown in the SSI8003-100 series documents. The proposal is that when updating the SSI8003-100 series documents this method should be added as an alternative to the data included in SSI8003-102F.

Also included in this document are the changes associated with the non-provision of a Power On input for MSL Crossings.


Edition : 8
File Size : 1 file , 280 KB
Number of Pages : 14
Published : 03/22/2012

History


Related products

NR BRS-SW 67-44 ISSUE 7
Published Date: 12/04/2004
Typical Free Wired Interlocking Circuits - Swinging Overlaps - Complicated Case, Route Sticks
$5.7
NR NR/L3/ELP/27240/NR/DIST C22A ISSUE 2
Published Date: 03/01/2017
Pressure Testing Procedure
$7.5
NR NR/L3/OPS/045/4.15 ISSUE 3
Published Date: 12/05/2020
National Operating Procedure (NOP) 4.15: Managing Stranded Passengers and Train Evacuation
$13.2
NR TWI 2G049 ISSUE 1
Published Date: 03/01/2005
How to Carry out Rail End Preparation
$5.7

Best-Selling Products