Name:
NR SSIDIS136 ISSUE 2 PDF
Published Date:
12/20/2006
Status:
[ Active ]
Publisher:
Network Rail
PURPOSE OF PAPER
For the Port Talbot East Project, Network Rail has requested an additional flashing aspect requirement - the junction signal must be approach released from red unless it can be proved that a flashing double yellow aspect will have been displayed to the Driver at the signal in rear.
The flashing aspect data detailed in SSI8003-69 is altered in accordance with Section 4 of this document. The alterations to the data are shown in bold.
| Edition : | 2 |
| File Size : | 1 file , 28 KB |
| Number of Pages : | 5 |
| Published : | 12/20/2006 |