NR SSIDIS136 ISSUE 2 PDF

NR SSIDIS136 ISSUE 2 PDF

Name:
NR SSIDIS136 ISSUE 2 PDF

Published Date:
12/20/2006

Status:
[ Active ]

Description:

Flashing Aspects - Proving Double Yellow

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

PURPOSE OF PAPER

For the Port Talbot East Project, Network Rail has requested an additional flashing aspect requirement - the junction signal must be approach released from red unless it can be proved that a flashing double yellow aspect will have been displayed to the Driver at the signal in rear.

The flashing aspect data detailed in SSI8003-69 is altered in accordance with Section 4 of this document. The alterations to the data are shown in bold.

 


Edition : 2
File Size : 1 file , 28 KB
Number of Pages : 5
Published : 12/20/2006

History


Related products

NR BRS-SM 101 ISSUE C
Published Date: 11/22/1971
Signal Detector
$5.7
NR RT/LS/S/012 ISSUE 3
Published Date: 06/01/2002
Inspection and Risk Assessment Forms for User-Worked, Footpath and Bridleway Level Crossings (aka NR/SP/OPS/012)
$18.6
NR NR/L2/ADG/002/03 ISSUE 1
Published Date: 12/03/2016
Asset Data Governance Framework Manual: Data Stewardship Management
$7.5
NR RT/ETE/5/5/4
Published Date: 03/17/1998
High Current Railway Negative Cable Strengthing at Substations and TP Huts
$5.7

Best-Selling Products