NR TI 033 ISSUE 1 PDF

NR TI 033 ISSUE 1 PDF

Name:
NR TI 033 ISSUE 1 PDF

Published Date:
06/01/2006

Status:
[ Withdrawn ]

Description:

DOUBLE CUTTING OF BACK CONTACTS IN SAFETY CRITICAL CIRCUITS

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
W/D * PDF ONLY

Introduction

The principle of double cutting of safety critical circuits to avoid the risk of an earth fault bridging out contacts in one leg of a circuit has been a long standing principle. GI/GN7517 details the measures to be taken to prevent such a risk and also lists some situations where double cutting may not be appropriate.

In a recent issue of typical circuits for LED signals, the decision was made to double cut the feeds to signal heads since this provided a safety benefit, however this was applied to both front and back contacts. Subsequent review has concluded that whilst double cutting the feed to, for instance, the red aspect provides a safety benefit with regard to earth faults, it increases the risk of failure preventing the critical indication being displayed.


Edition : 1
File Size : 1 file , 34 KB
Number of Pages : 2
Published : 06/01/2006

History


Related products

NR BRS-SM 695/1
Published Date: 08/01/1996
Train Operated Points Connection Rod
$5.7
NR NR/CIV/SD/720 ISSUE A
Published Date: 04/01/2008
Lighting General Arrangement
$5.7
NR SMF/TK/0243 ISSUE 2
Published Date: 03/04/2023
RCM Regime Effectiveness Tracker
$5.7
NR NR/L3/OCS/044/FS-20A ISSUE 1
Published Date: 06/04/2011
Managed Station Manual: Hazard Classification System
$5.7

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138