NR TI 048 ISSUE 1 PDF

NR TI 048 ISSUE 1 PDF

Name:
NR TI 048 ISSUE 1 PDF

Published Date:
10/01/2006

Status:
[ Withdrawn ]

Description:

TPWS Loops - Incorrect Re-Installation following Pway Work

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-ti-048-issue-1_2765540

Choose Document Language:
5.70 €
Need Help?
W/D * PDF ONLY

Introduction

In recent months a number of TPWS brake application faults have been noted in FMS where the train has been stopped on it's approach to the associated signal displaying a proceed aspect. They all occurred following the removal and re-installation of TPWS loops for PWay work.

Investigations revealed that the Arming and Trigger loop grid assembly plug coupled cables had been incorrectly crossed when re-installing the loops.

These TPWS brake application faults are not in themselves Wrong Side Failures.

What is of concern is the potential failure mode for a train travelling in the opposite direction on the bi-directional line. If it were to pass the signal at danger, then no TPWS intervention would occur, resulting in a Wrong Side Failure.

The SMTH testing conducted failed to reveal this potential Wrong Side Failure.


Edition : 1
File Size : 1 file , 42 KB
Number of Pages : 2
Published : 10/01/2006

History


Related products

NR NR/CIV/SD/FORM4/4200 ISSUE 2
Published Date: 03/07/2020
Station Footbridges: Ribbon Covered Footbridge Series 4200: Form 004
35.40 €
NR BRS-SM 323
Published Date: 05/01/1980
M3A Point Machine Modification to Circuit Controller
5.70 €
NR NR/CIV/SD/FORMA/320 ISSUE P3
Published Date: 03/03/2012
Drainage Systems (Track and Off Track)
24.30 €
NR TWI 2C043 ISSUE 1
Published Date: 03/01/2005
How to Recognise Fastenings
7.50 €

Best-Selling Products

HPS ANSI/HPS N12.1
Published Date: 01/01/2015
Fissile Material Symbol
7.50 €
HPS ANSI/HPS N13.11
Published Date: 01/01/2009
Personnel Dosimetry Performance - Criteria for Testing
HPS ANSI/HPS N13.11
Published Date: 01/13/2009
Personnel Dosimetry Performance - Criteria for Testing
HPS ANSI/HPS N13.11
Published Date: 12/01/2022
Personnel Dosimetry Performance - Criteria for Testing
21.00 €
HPS ANSI/HPS N13.12
Published Date: 01/01/2013
Surface and Volume Radioactivity Standards for Clearance
HPS ANSI/HPS N13.12
Published Date: 03/15/1998
Surface and Volume Radioactivity Standards for Clearance