Name:
NR TI 054 ISSUE 1 PDF
Published Date:
02/01/2007
Status:
[ Withdrawn ]
Publisher:
Network Rail
The contents of the amended sections of the SMTH are of relevance to all who are engaged in, or manage Signalling Maintenance Testing on Network Rail controlled Infrastructure that includes ALSTOM SO Hydraulic Supplementary Point Drive Equipment
Purpose:
This Technical Instruction gives details of amendments to sections of the SMTH that are to be used to carry out maintenance testing on Alstom SO Hydraulic Supplementary Drive Equipment (also known as Hy-Drive).
The amended sections of the SMTH will be included in NR/SP/SIG/11231 at the next re-issue of the document.
| Edition : | 1 |
| File Size : | 1 file , 29 KB |
| Number of Pages : | 2 |
| Published : | 02/01/2007 |