NR TI 079 ISSUE 2 PDF

NR TI 079 ISSUE 2 PDF

Name:
NR TI 079 ISSUE 2 PDF

Published Date:
08/26/2008

Status:
[ Withdrawn ]

Description:

SMTH Testing Plan - Isolation of TPWS Equipment at Simple PSRs

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
W/D * PDF ONLY

Applies to Permanent Speed Restrictions covered by the ORR exemption and also where the circuitry is basically covered by the TPWS typical circuit "Control Circuits for Retro Fitment of TPWS to Buffer Stops and PSRs" (Drawing T34025). This TI is only to be used where specifically authorised for specific PSRs.

Purpose of TI

An exemption to the TPWS regulations has been granted by ORR. This allows Network Rail to decommission TPWS equipment at selected PSRs. In order to facilitate this work, the TPWS equipment at the selected PSRs will initially be electrically isolated. This Technical Instruction allows that isolation to be undertaken using the Signalling Maintenance Testing Handbook (SMTH).


Edition : 2
File Size : 1 file , 190 KB
Number of Pages : 5
Published : 08/26/2008

History


Related products

NR TWI 2G095 ISSUE 2
Published Date: 12/01/2006
Erection / Dismantling of Welding Umbrella and Support
$5.7
NR NR/L3/OCS/043/5.15 ISSUE 1
Published Date: 03/01/2008
National Control Instructions: Station Overruns and Failure to Call
$5.7
NR NR/L2/SIG/30009/A200 ISSUE 3
Published Date: 12/04/2021
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Legacy Arrangements
$18.6
NR NR/L2/TRK/052 ISSUE 4
Published Date: 06/06/2020
Rail, Baseplate and Under-Sleeper/Bearer Pads
$13.2

Best-Selling Products

Manual of Cross-Connection Control
Published Date: 12/01/1993