NR TI 135 ISSUE 1 PDF

NR TI 135 ISSUE 1 PDF

Name:
NR TI 135 ISSUE 1 PDF

Published Date:
04/01/2009

Status:
[ Withdrawn ]

Description:

Reliability Centred Maintenance of Signalling Equipment (ROSE) - FPL Testing Frequency Rationalisation

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

FPL testing on point equipment of types specified in section 1.1 of this instruction.

Purpose

This Technical Instruction is to instruct delivery units on the application and management of RoSE testing frequency rationalisation to Facing Point Lock (FPL) testing.


Edition : 1
File Size : 1 file , 110 KB
Number of Pages : 15
Published : 04/01/2009

History


Related products

NR BRS-ST 82/11
Published Date:
Pin Driving Lugs Lifting Barrier (Auto) MK II B
$5.7
NR NR/SIG/10665/MOD 032 ISSUE 1
Published Date: 12/07/2013
Reliability Centred Maintenance of Signalling Equipment (ROSE) - Point Operating Equipment - Style 63 Service B (NR/ROSE/PO-B4/1)
$5.7
NR BRS-SM 2591
Published Date: 01/30/1995
Mechanical Backdrive External to 4' on RHS for Full Depth CV Layout Point Machine Mounted LHS
$5.7
NR NR/L3/ELP/27240 ISSUE 12
Published Date: 06/03/2023
Distribution Work Instructions
$13.2

Best-Selling Products

BS IEC/TR 61838:2001
Published Date: 05/15/2001
Nuclear power plants. Use of probabilistic safety asessment for the classification of instrumentation and control functions
$92.964