Name:
NR TI 135 ISSUE 1 PDF
Published Date:
04/01/2009
Status:
[ Withdrawn ]
Publisher:
Network Rail
FPL testing on point equipment of types specified in section 1.1 of this instruction.
Purpose
This Technical Instruction is to instruct delivery units on the application and management of RoSE testing frequency rationalisation to Facing Point Lock (FPL) testing.
| Edition : | 1 |
| File Size : | 1 file , 110 KB |
| Number of Pages : | 15 |
| Published : | 04/01/2009 |