NR TI 158 ISSUE 1 PDF

NR TI 158 ISSUE 1 PDF

Name:
NR TI 158 ISSUE 1 PDF

Published Date:
02/24/2011

Status:
[ Withdrawn ]

Description:

Signal Failure Investigation on Equipment Newly Commissioned and Not Yet Handed over to Maintenance

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
W/D * PDF ONLY

This Technical Instruction applies to SFI Level 2 and Level 3 staff and revises SMTH Part 5/S001 by adding a new Section 23. It applies to wrong side failure investigation on equipment which has been taken into operational use but has not been taken over by the Maintenance organisation.

Purpose

To advise Signal Failure Investigation Level 2 and Level 3 staff that project managers shall be informed when wrong side failures happen to newly commissioned infrastructure that has been taken into operational use but has not been taken over by the Maintenance organisation.


Edition : 1
File Size : 1 file , 28 KB
Number of Pages : 2
Published : 02/24/2011

History


Related products

NR BRS-SC 20 ISSUE B
Published Date: 06/09/1975
Cable Trough - Concrete Tee Junction Segments for 190mm Wide 130mm Deep & 250mm Wide 130mm Deep Internally - Troughs
$5.7
NR RT/CE/S/059 ISSUE 1
Published Date: 06/01/1996
GEOGIS Data
$18.6
NR NR/GN/SIG/11115 ISSUE 4
Published Date: 08/26/2008
Correlation of Signalling Records
$18.6
NR NR/SIN/132 ISSUE 1
Published Date: 07/02/2014
36W Level Crossing Wig-Wag Units – Conversion to LED
$7.5

Best-Selling Products