NR TPWS/TI/011 ISSUE 3 PDF

NR TPWS/TI/011 ISSUE 3 PDF

Name:
NR TPWS/TI/011 ISSUE 3 PDF

Published Date:
07/22/2002

Status:
[ Withdrawn ]

Description:

TPWS Trackside Test Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

This Technical Instruction applies to the commissioning and ongoing maintenance testing requirements of TPWS trackside equipment fitted at signals, buffer stops and PSRs. It should be read in conjunction with Railtrack Company Standards: TPWS Signalling Works Testing RT/E/S/10135; Implementation Of Signalling Maintenance Specifications RT/E/S/10660; SIGTAN 040 (RT/E/S/19040); Signalling Maintenance Testing RT/E/S/11231 and TPWS Technical Instruction TPWS/TI/027 on Buffer Stop Mini-Loops.


Edition : 3
File Size : 1 file , 270 KB
Number of Pages : 14
Published : 07/22/2002

History


Related products

NR TWI 3G023 ISSUE 1
Published Date: 03/01/2005
How to Manage Cold Weather
$5.7
NR NR/L2/SIG/30014/D120/TS5-66 ISSUE 2
Published Date: 12/05/2020
Signalling Works Testing Handbook: Frauscher FAdC R1 and R2 Axle Counter Evaluator System Test Specification
$7.5
NR NR/L3/CIV/194 ISSUE 2
Published Date: 12/03/2022
Selection and Design of New and Upgraded Lifts
$24.3
NR E10000/1/19 ISSUE A
Published Date: 01/25/1993
Signal Control Circuits - Delayed Yellow
$5.7

Best-Selling Products

ICAC EP-7
Published Date: 01/01/2004
ELECTROSTATIC PRECIPITATOR GAS FLOW MODEL STUDIES
ICAC EP-8
Published Date: 11/01/1993
Structural Design Criteria for Electrostatic Precipitator Casings
ICAC F-3
Published Date: 01/01/2002
Operation and Maintenance of Fabric Collectors
ICAC WP-1
Published Date: 05/01/2009
White Paper: Selective Catalytic Reduction (SCR) Controls for NO x Emissions from Fossil Fuel-Fired Electric Power Plants