Name:
NR TWI 2B001 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers removing the ballast from a bay down to sleeper bottom (opening out) and filling in a bay after opening out (boxing in)
See also separate instruction
TWI 2B004 How to regulate ballast by hand
TWI 3B001 How to dig out (and dispose of) contaminated ballast
| Edition : | 1 |
| File Size : | 1 file , 170 KB |
| Number of Pages : | 5 |
| Published : | 03/01/2005 |