NR TWI 2B016 ISSUE 1 PDF

NR TWI 2B016 ISSUE 1 PDF

Name:
NR TWI 2B016 ISSUE 1 PDF

Published Date:
03/01/2005

Status:
[ Active ]

Description:

How to Maintain Ash Ballasted Track

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

Introduction

This Track Work Instruction deals with the maintenance of ash-ballasted track.

Ash ballast is often found on low speed, low axle weight railways.

See also separate instructions:

TWI 2B001 How to open out and box in

TWI 2B008 How to recognise types of ballast


Edition : 1
File Size : 1 file , 88 KB
Number of Pages : 3
Published : 03/01/2005

History


Related products

NR BRS-SM 605 ISSUE C
Published Date: 08/24/1981
Post Mounted Signs Lamp Assembly
$5.7
NR NR/L3/OPS/0064 ISSUE 6
Published Date: 06/05/2021
Delivering Work within Possessions (aka NR/L3/INI/CP0064)
$18.6
NR NR/L3/SIG/SG0163 ISSUE 3
Published Date: 09/03/2011
Management of Data from Logging Systems and Event Recorders
$13.2
NR T25330 ISSUE 4
Published Date: 03/06/2010
Lineside & On Track Typical Circuits Points Point Machine Internal Wiring Westinghouse Style 63, Non-AC Immune, Split Field (30V or 120V) Type
$5.7

Best-Selling Products