NR TWI 2C037 ISSUE 5 PDF

NR TWI 2C037 ISSUE 5 PDF

Name:
NR TWI 2C037 ISSUE 5 PDF

Published Date:
04/01/2015

Status:
[ Active ]

Description:

How to Carry out a Gap Survey and Rail Adjusting on Jointed Track

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-twi-2c037-issue-5_2763385

Choose Document Language:
13.20 €
Need Help?
PDF ONLY

Introduction

This track work information sheet details how to survey, scope and deliver rail adjusting on jointed track, it covers:

  • Jointed rail gap survey using both the paper and digital TEF

  • Rail gap adjustment including a full scope to identify the work required

  • Reference to associated works.

  • Tightening or replacing any seized bolts or fastenings

 


Edition : 5
File Size : 1 file , 910 KB
Number of Pages : 12
Published : 04/01/2015

History


Related products

NR NB 053 ISSUE 1
Published Date: 12/01/2005
Alstom TASS Balise
5.70 €
NR NR/CIV/SD/1340 ISSUE H
Published Date: 03/01/2019
U-Type Underbridges: Bearings: Notes
5.70 €
NR NR/CIV/SD/2148-2 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 7.4m External Unit Setting Out Details - Skew 15°
5.70 €
NR T25111 ISSUE 1
Published Date: 03/06/2010
Lineside & on Track Typical Circuits Points Clamp Locks - Double End Location Control and Split Detection Line Circuits Two Locations - Loc 2
5.70 €

Best-Selling Products