Name:
NR TWI 2G004 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers how to use Pell voidmeters for the preparation of measured shovel packing and general track maintenance.
It is not intended to cover the use of voidmeters in connection with derailment surveys.
See also separate instructions:
TWI 2P021 How to recognise longitudinal timber deterioration.
TWI 2T013 How to lift and pack plain line
| Edition : | 1 |
| File Size : | 1 file , 100 KB |
| Number of Pages : | 3 |
| Published : | 03/01/2005 |